STEP 1: CONSTRUCTION PRICE
Staff will calculate the volume and quote the construction price based on the completed design draft handed over, the construction items will be based on the desired needs of the investor.
The quotation will include the cost and detailed description of the materials to be used for the work. For example: the type of wood to use (walnut, oak, Laminate, Acrylic, …), the type of water-based paint to use (Dulux, Jotun, Maxilite, …)
STEP 2: SIGN CONSTRUCTION CONTRACT
Items will be constructed after agreeing on the handed over costs. The two parties will sign the construction contract and deposit the construction fee for the first phase.
STEP 3: SAMPLE SUPPLY AND MATERIALS BEFORE CONSTRUCTION
Before proceeding with the construction, AKITEK.vn will present the actual sample for the investor to approve first. For example: wall paint color, wooden floor pattern, tile pattern, wood pattern for interior…
STEP 4: PRODUCTION AT THE FACTORY, COMPLETE COMPLETE AT THE WORKS
This phase will carry out parallel construction of finishing items at the construction site: flooring, refrigeration – light electricity, data, cameras, water supply and drainage, schematic diagrams… (if any) and production of furniture. factory furniture
STEP 5: ACCEPTANCE AND HANDLING OF THE WORKS
After completing the construction process. The investor and AKITEK.vn will jointly check and hand over the project. After the handover is completed, the contract will be liquidated.